 Variables
          bvr(rR)      indicating whether reactor r is active
           nB(rR,pP)   
number of batches of product p in reactor r

Binary Variables
      nBx(rR,pP,i)
dyadic represenation of nB

SOS2 Variables
      lambda(rR,j)
approximation of economies of scale function



 
$Title  Product Portfolio Optimization  (KPORT,SEQ=270)
$Ontext

This problem computes minimal cost solutions satisfying the
demand of pre-given product portfolios. It determines the number
and size of reactors and gives a schedule of how may batches of
each product run on each reactor. There are two scenarios (s1 20
products. s2 40 products), add --scenario s2 as a GAMS
parameter to specify the second scenario.

The global optimal reactor volumes are:
data set s1
vr.fx('r1') = 132.5; vr.fx('r2') = 250;

data set s2
vr.fx('r1') = 20; vr.fx('r2') = 100; vr.fx('r3') = 250;

Two formulations are presented, a compact MINLP formulations
and a linearized MIP formulation using special ordered sets.

Problem sizes for data set s1

                        
MINLP       MIP
variables                 102        548
equations                  28        418
Non-zeros                 190       1574
discrete variables         40        186


Kallrath, J. Exact Computation of Global Minima of a Nonconvex
Portfolio Optimization Problem. In Frontiers in Global Optimization.
Eds Floudas C A and Pardalos P M. Kluwer Academic Publishers,
Dortrecht, 2003.

$Offtext
$eolcom //

Sets
       s     
scenario / s1,s2 /
       rR    
reactors / R1*R3 /
       pP    
products / L1*L37 /
       r(rR) 
reactors considered in scenario
       p(pP) 
products considered in scenario

Table RData(rR,s,*) Reactor data

       
s1.VMIN  s1.VMAX  s2.VMIN  s2.VMAX
R1        102.14     250     20         50
R2        176.07     250     52.5      250
R3                          151.25     250


Table PData(pP,s,*) Product data

    
s1.Dem s1.PTime s2.Dem s2.Ptime
L1     2600      6     2600      6
L2     2300      6     2300      6
L3     1700      6      450      6
L4      530      6     1200      6
L5      530      6      560      6
L6      280      6      530      6
L7      250      6      530      6
L8      230      6      140      6
L9      160      6      110      6
L10      90      6      110      6
L11      70      6       10      6
L12     390      6      110      6
L13     250      6       90      6
L14     160      6       90      6
L15     100      6       90      6
L16      70      6       70      6
L17      50      6       50      6
L18      50      6       30      6
L19      50      6       10      6
L20                      10      6
L21                      10      6
L22                     190      6
L23                     180      6
L24                      70      6
L25                      70      6
L26                      40      6
L27                      40      6
L28                      40      6
L29                      30      6
L30                      20      6
L31                      20      6
L32                      20      6
L33                      10      6
L34                      10      6
L35                      10      6
L36                      10      6
L37                      10      6


Parameters
      VMIN(rR)    
volume flow of products in m^3 per week
      VMAX(rR)    
volume flow of products in m^3 per week
      DEMAND(pP)  
volume flow of products in m^3 per week
      PRODTIME(pP)
production time in hours per batch
Scalars
      WHRS  
hours in a week                                / 168  /
      CSTI  
in kEuro depreciation per m^3 reactor and week / 0.97 /
      CSTF  
in kEuro per week and reactor                  / 2.45 /
      ESF   
economies of scale factor                      / 0.5  /;

$if not set scenario $set scenario s1
VMIN(rR)     = RDATA(rR,
'%scenario%','VMIN');
VMAX(rR)     = RDATA(rR,
'%scenario%','VMAX');
DEMAND(pP)   = PDATA(pP,
'%scenario%','Dem');
PRODTIME(pP) = PDATA(pP,
'%scenario%','PTime');

* Determine scenario sets
r(rR) = VMAX(rR)   > 0;
p(pP) = DEMAND(pP) > 0;

* definition of compact MINLP model

Variables  cTotal       total  costs
           cInvest     
invest cost
           cFixed      
fix    costs
           f(rR,pP)    
utilization rate
           vR(rR)      
reactor volume in m^3
           pS(pP)      
surplus production
           bvr(rR)     
indicating whether reactor r is active
           nB(rR,pP)   
number of batches of product p in reactor r

Positive variables f,vR,pS; Integer variable nB; Binary Variables bvr;


Equations DEFcT          total costs
          DEFcF         
fix costs
          DEFcI         
invest cost
          TR(rR)        
production time of reactor r
          SPP(pP)       
compute surplus production p
          RVUB(rR)      
maximal volume of reactor r
          RVLB(rR)      
minimal volume reactor r;


* define the total cost
DEFcT..  cTotal  =e= cFixed + cInvest;
DEFcF..  cFixed  =e=
sum (r, CSTF*bvr(r));
DEFcI..  cInvest =e=
sum (r, CSTI**ESF*vR(r)**ESF);

* limit the total production time of reactor r
TR(r)..   
sum(p, PRODTIME(p)*nB(r,p) ) =l= WHRS*bvr(r);

* compute the surplus production
SPP(p)..   pS(p) =e=
SUM(r, nB(r,p)*f(r,p)*vR(r))/DEMAND(p) - 1 ;

* lower and upper bounds on reactor volume
RVLB(r)..  vR(r) =g= VMIN(r)*bvr(r);
RVUB(r)..  vR(r) =l= VMAX(r)*bvr(r);

Model     portfolioMINLP / DEFcT, DEFcF, DEFcI, TR, SPP, RVLB, RVUB / ;

f.lo(r,p) = 0.4; f.up(r,p)  = 1; 
// bounds on the utilization rates
pS.lo(p)  =   0; pS.up(p)   = 1; 
// bounds on the surplus production

* bounds on the number of batches
nB.lo(r,p) = 0;
nB.up(r,p) = min(WHRS/PRODTIME(p),floor(2*DEMAND(p)/(VMIN(r)*f.lo(r,p))));
nB.up(r,p)$(2*DEMAND(p) < f.lo(r,p)*VMIN(r)) = 0;

vR.l(rR) = 99;
vR.lo(r) = VMIN(r);

solve portfolioMINLP using minlp minimizing cTotal;

* additional variables and equations to define the MIP formulation
* first we need to linearize the product terms:

Sets i            dyadic represenation set       / 0*10 /
     j           
discretization points for SOS2 / 0*10 /
     rpi(rR,pP,i)
i required for representing np

Parameters
    vRj(rR,j)   
x part of SOS2 construct
    ESFvRj(rR,j)
y part of SOS2 construct

Positive Variable
      pT(rR,pP)   
number of batches x reactor volume in m^3
      pT2(rR,pP,i)
same for in dyadic representation
      ESFvR(rR)   
economies of scale for vR

Binary Variables
      nBx(rR,pP,i)
dyadic represenation of nB

SOS2 Variables
      lambda(rR,j)
approximation of economies of scale function

Equations
      CNP(rR,pP) 
compute the nonlinear products nB(rp)*f(rp)*vR(r)
      SPPx(pP)   
compute surplus production p
      CNPl0(rR,pP)  
linearized version of CNP
      CNPl1(rR,pP)  
linearized version of CNP
      CNPl2(rR,pP,i)
linearized version of CNP
      CNPl3(rR,pP,i)
linearized version of CNP
      CNPl4(rR,pP,i)
linearized version of CNP
      DEFSOSx(rR)   
SOS2 x construct
      DEFSOSy(rR)   
SOS2 y construct
      DEFSOSone(rR) 
SOS2 sum construct
      DEFcIlp       
linearized version of DEFcI;

* new surplus production equation
SPPx(p)..   pS(p) =e=
SUM(r, pT(r,p))/DEMAND(p) - 1 ;

* computes batches x volume
CNP(r,p).. pT(r,p) =e= nB(r,p)*f(r,p)* vR(r);

* Linearized version of CNP
CNPl0(r,p)..         pT(r,p)  =e=
sum(rpi(r,p,i),2**(ord(i)-1)*pT2(rpi));
CNPl1(r,p)..         nB(r,p)  =e=
sum(rpi(r,p,i),2**(ord(i)-1)*nBx(rpi));
CNPl2(rpi(r,p,i))..  pT2(rpi) =l= VMAX(r)*nBx(rpi);
CNPl3(rpi(r,p,i))..  pT2(rpi) =l= vR(r);
CNPl4(rpi(r,p,i))..  pT2(rpi) =g= f.lo(r,p)*(vR(r)-VMAX(r)*(1-nbx(rpi)));


* SOS2 approximation of economies of scale function
DEFSOSx(r)..  vR(r) =e=
sum(j, vRj(r,j)*lambda(r,j));

DEFSOSy(r)..  ESFvR(r) =e=
sum(j, ESFvRj(r,j)*lambda(r,j));

DEFSOSone(r)..
sum(j, lambda(r,j)) =e= 1;

DEFcIlp..  cInvest =e=
sum (r, CSTI**ESF*ESFvR(r));


rpi(r,p,i) =
ord(i) <= ceil(log(max(1,nB.up(r,p)))/log(2)) + 1$nB.up(r,p);

vRj(r,j) = (VMAX(r)-VMIN(r))*(
ord(j)-1)/(card(j)-1) + VMIN(r);
ESFvRj(r,j) = vRj(r,j)**ESF;

Model PortfolioMIP  /TR, SPPx, RVLB, RVUB, DEFcF, DEFcIlp, DEFcT,
         
CNPl0, CNPl1, CNPl2, CNPl3, CNPl4, DEFSOSx, DEFSOSy, DEFSOSone/;


portfolioMIP.optcr = .05;
solve portfolioMIP using mip minimizing cTotal;




      The search was stopped because the last MIP problem was infeasible. DICOPT will not be able to find a better integer solution.